Skip to main contentSkip to navigationSkip to footer

Overview of Fix and Flip Pitfalls

13 minPRO
1/6

Key Takeaways

  • Approximately 25-35% of flips underperform targets, with 10-15% resulting in outright losses.
  • Renovation overruns (60%+), extended hold times (40%+), and ARV over-estimation (30%+) are the most common pitfalls.
  • Pitfalls compound—a renovation overrun extends the timeline, increasing financing and holding costs.
  • A prevention mindset with built-in contingencies is more effective than reactive problem-solving.
This track contains subscriber-only lessons

Explore free tracks in this area of study, or subscribe for full access.

Browse available tracks
"Flip Risk Management: Cost Overruns, Timing & Ethics" is a Pro track

Upgrade to access all lessons in this track and the entire curriculum.

Test Your Knowledge

1.What percentage of flipped properties result in outright losses?

2.Which fix-and-flip pitfall affects the highest percentage of projects?

3.How much contingency should be built into renovation budgets?