Key Takeaways
- Red flags include large upfront payment requests, no written contract, significantly low bids, and poor communication.
- Document all contractor issues with photos and written references to the SOW.
- Maintain a roster of 3-5 vetted contractors per trade as backup options.
- A reliable contractor at 10-15% premium is typically cheaper than the lowest bidder in total project cost.