Key Takeaways
- Five prevention strategies (contractor selection, specs, alignment, materials, supervision) eliminate 80% of defects.
- Quality contingency: 2-3% of construction cost and 3-5 days schedule buffer.
- Replace rather than repair when correction cost exceeds replacement cost.
- Documentation is self-created insurance that pays dividends at every project phase.