Key Takeaways
- Construction pitfalls fall into four categories: scope, financial, schedule, and quality—each requiring different controls.
- Hidden conditions cause 60-80% of renovation budget overruns and are the biggest financial risk in construction.
- Controls operate at three levels: Prevention (cheapest), Detection (mid-cost), and Response (most expensive).
- Every dollar spent on preventive controls (planning, inspection) saves $5-$10 in construction-phase problem resolution.